a boiler agent maximum of 175 kg cm2

a boiler agent maximum of 175 kg cm2

  • maximum allowable pressure drop of 1.0 by .85 gives 1.18 psi per 100 feet. Refer to Table 45-2 for 15 psig steam. With a pressure drop of 1.0 psi per 100 feet, a 5" pipe will give a flow of 6,160 lbs/hr. On the basis of pressure drop only, a 5" pipe could be selected, however, the velocity will be between 10,000 and 12,000 fpm.

    View More
  • Our Agents: Contact us : Oil Fired Steam Boilers, IBR Boilers, Steam Generating Boilers, Non- IBR Boilers, Baby Boilers, India: in a wide range of steam generating capacities from 50 Kgs/hr to 1000 Kgs/hr F & A 100°C designed for maximum pressure of 15 Kg/cm2 at overall efficiency of 88± 2% on N . C . V. P & I DIAGRAM OF AN OIL FIRED

    View More
  • A factor of 0.85 has been applied in arriving at the maximum allowable stress values in tension for this material. Divide tabulated values by 0.85 for maximum allowable longitudinal tensile stress. except for tubular products 75 mm O.D. or less enclosed within the boiler setting, use of these materials at these temperatures is not current

    View More
  • AME 50531: Intermediate Thermodynamics Homework Solutions Fall 2010 1 Homework 1 Solutions 1.1 Problem 1: CPIG air enters and isentropic nozzle at 1.30 atm and 25 C with a velocity of 2.5 m/s. The nozzle entrance diameter is 120 mm. The air exits the nozzle at 1.24 atm with a velocity of 90 m/s. Determine the temeprature of the exiting air

    View More
  • F & A Rating Of Boiler - posted in Student: we need to calculate the boiler capacity based on F&A rating.Our consumption is 2500 kg/hr steam at 17kg/cm2(g)We provide feed water at 100degC to the boiler drum.please suggest, how to arrive at F&A rating.Thanks in Advance.Regards,raghav.

    View More
  • Maximum consumption of oil kg/h 39 51 62 75 98 120 150 Water volume - normal level m³ 0,7 0,9 1,2 1,6 2,3 3,0 3,8 Maximum height of the boiler mm 2000 2000 2200 2300 2500 2900 2900 fast spare parts supply and a broad net of agents, we guarantee immediate and reliable support for all our clients’ needs.

    View More
  • EXCERPTS FROM: ASME BOILER AND PRESSURE VESSEL CODE SECTION I − POWER BOILERS 2010 EDITION INTRODUCTION This Code covers rules for construction of power boilers1, electric boilers2, miniature boilers3, high−temperature water boilers4, heat recovery steam generators5, and certain fired pres-

    View More
  • Boilers and Steam Lines Chemical Cleaning. Prem Baboo. DGM (Production & Process) Abstract:- The aim of Chemical Cleaning is to is to safely remove all deposits from the inside of the boiler tubes. mill scale, oil, paint, preservatives, rust, welding slags that would have entered during the assembly of new tubes.

    View More
  • A guideline would be to aim for lkg/cm2 after 2 hours firing, 5kg/cm2 after 2.75 hours firing and 12 kg/cm2 after 3.25 hours firing. f) When the drum pressure has risen to about 2 kg/cm2, close the drum vent valve. g) Drain and warm through all steam supply lines to ancillary equipment before putting the boiler on load.

    View More
  • Sensor and instrumentation product information, application guides, technical support articles, online converters and calculators to help with your measurement requirements.

    View More
Related Products
Leave a message